During AUG, SEP – we had to slow down our construction work on the build, as our fund raising efforts were lagging behind our needs to purchase the material needed for the build.
Still we were able to complete many of the items and managed to have more than enough work for our volunteers during this time.
In OCT-2011 – The Fuller Foundation made another significant contribution to this project. These funds will allow us to accelerate the build work and drive to closure of construction.
During OCT, NOV, DEC – with the help of our regular volunteer construction crew and numerous other helpers. We have made significant progress.
From mid summer to early winter – we have completed;
Insulation installed
Electrical wiring installed
Plumbing installed
Heating system installed
Septic system installed and inspected
Drywall installed
Drywall taped and plastered
Installation of interior doors and door and window trim.
Painting of interior
Started the installation of laminate flooring upstairs
We are well on our way to finishing the construction activities to allow for completion in late JAN-2012
———————————————————————–
Now with sufficient funds from our end of year appeal letter to Town of Boylston residents and the continued support of the Fuller Foundation.
We are driving to a completion of construction work by end of JAN 2012. Which we now will achieve.
See “Up Coming Events” – For OUR Dedication Ceremony on 21-JAN-2012 (SAT) at 1PM.
The ongoing construction work that has been completed or will be in the next week;
Heating system inspected and turned on – YES heat in the house, finally!
Electrical and Plumbing inspected and turned on
Kitchen and Bath cabinets installed
Kitchen appliances being installed as we talk
Exterior work included the construction of 2 retaining walls
Exterior grading
Installation of ceramic tile in kitchens and bathroom floors.
To be done in the next week;
Finish tile work, finish installing light fixtures, sinks and plumbing fixtures
Install laminate flooring downstairs
Do a major cleaning
Prepare for the Dedication Ceremony on 21-JAN-2012
With the winter weather – we will have to come back and finish two last construction items;
Landscaping of the site
Paving the driveway and parking spots (we have spread gravel for the winter).