Construction activities – We have been really moving along
With our many volunteers we have just about finished the installation of the siding on the duplex, interior walls are up, and furring strips for the ceilings have also been installed.
With our professional volunteers in (plumping and electrical) – they have basically finished the plumping and wiring work.
Upcoming work will be painting of the exterior siding, construction of our front deck/porch entrance at the front door area.
Installing insulation into the 2×6 exterior walls, and Drywall.
We want to thank again all of the individuals and groups that have volunteered their time and energy to help during construction.
Take a look at the “Our Progess” tab for updated pictures.
Fund Raising – as with all Habitat for Humanity projects we need to raise dollars to be able to purchase all the supplies that we are using during the construction. Come and help us by attending some or all of our events.
Take a look at the “Up Coming Events” for details of our Fund Raising events.
- FRI 13-MAY-2011 – UNO’s Chicago Grill at 25 Major Taylor Blvd. in Worcester
- Boylston Memorial Day – On the Common – Habitat Table
- 11-JUN-2011: Fiddler on the Roof – at the Hanover Theater
- 15-JUN-2011: Cocktail Social at The People’s Kitchen, Worcester